Construction process
| Owner and Builder | Mark Thevenot |
| Building Time | 3 weeks from start to finish |
| Cost | Materials and 20 ft HC container are around $20k CAD. 250 labour hours. |
| Insulation | 2 pound sprayfoam approx 2-1/2” thick |
| Area | 144 Square Foot |
| Year | 2019 |
Construction process
![]() |
| Tires were not designed to go on the highway, it’s just to roll around for positioning within a yard for relatively short distances or up a trailer ramp. |
![]() |
| 2” Styrofoam insulation |
![]() |
| There is a square tube along each side to screw to the ceiling. The walls are attached to the ceiling and floor frame. |
![]() |
| Grizzly Cubic Mini Wood Stove |